top of page
Red Staircase

Advanced Architectural Construction | ARC 60104

Lecturers:Ts. Dr. Mohamed Rizal Mohamed & Ar. Edwin Chan Yean Liong

Tutor: Ts. Dr. Mohamed Rizal Mohamed

This module was conducted in conjunction with the studio project. We were brought through various construction systems and were introduced to IBS systems, increasing our knowledge of practical construction. 

A3 Report.png

01

Industrialised Building System

As a group of 6, we were to research a designated IBS and propose an apartment using that system, providing the needed drawings and calculating the final IBS Score to ensure it meets IBS standards.

02a

Construction Solutions

In conjunction with the studio project, we had to prepare an A3 report detailing the case studies of construction systems we will refer to in our project, along with two alternative facade systems and two sectional perspectives of the building.

AAC P2 Report.png